You are here:Home->Quality Management
Gangfeng stick to adhere to the “quality is the life of enterprise”and“quality win the trust of customers”as faith, in accordance with the requirements of ISO9000 quality management system standards to establish the quality inspection and control in the “Stock-Product-Goods”process. The main parts of mould using standard production method, ensure interchangeability of similar parts and include outsorcing implement the process of verification and validation to make sure the reliability of mould assembly quality. All staff comply with the disciplinary process, continuous improvement and continuously improve the quality of work, manufacturing quality to ensure mould quality.
Stock inspection:the procurement of raw materials,to verify the warranty and detection spare parts incoming inspection with drawing.
Process inspection:the implementation of staff first inspection, mutual inspection and professional inspection at each working procedure,eliminate the bad products into the next process.
Products inspection:every mould need factory test, the sample have to meet the requirement to get the customer final confirmed.
Audit and verification of the product drawing and Inspection should be responsibility of technology quality director
Measuring,inspecting and recording for product should be responsibility of technical director
All kinds of inspection report have to include this category:inspection items,inspection standards,test tools,test identification and inspection record form.
When there’s defective product,carries on the reason analysis,clear responsibility,formulate corrective,and preventive measures must be made.
Summary all kinds of inspection and testing record table.Press mould number in the customer file.
Stock inspection:the procurement of raw materials,to verify the warranty and detection spare parts incoming inspection with drawing.
Process inspection:the implementation of staff first inspection, mutual inspection and professional inspection at each working procedure,eliminate the bad products into the next process.
Products inspection:every mould need factory test, the sample have to meet the requirement to get the customer final confirmed.
Audit and verification of the product drawing and Inspection should be responsibility of technology quality director
Measuring,inspecting and recording for product should be responsibility of technical director
All kinds of inspection report have to include this category:inspection items,inspection standards,test tools,test identification and inspection record form.
When there’s defective product,carries on the reason analysis,clear responsibility,formulate corrective,and preventive measures must be made.
Summary all kinds of inspection and testing record table.Press mould number in the customer file.
检测仪器
-
Measurements
-
Hardness testig machine
-
Hardness testing machine
-
Luer 6:100 ring gauge
-
Plug gauge
-
Lateral force testing mac..
-
shadowgraph
-
Pulling force testing mac..
-
Balance
-
Three-dimensional testin..